~ <br />UO Arena Mitigation, City Priorities <br />2) Agate Street mid-block pedestrian crossing between 13th and 15th. <br />', . <br /> 7/29/2008 <br /> Construction Costs ~ uantit Unit Unit Price Extended Total <br />0010 Mobilization 1 LS 15% of const $11,232.00 <br />. 0020 Temporary Work Zone Traffic Control - Complete ~1 LS $4,000.00 $4,000.00 <br />0030 Erosion Control 1 LS $750.00 $750.00 <br />0040 Flagging 100 HOUR $40.00 $4,000.00 <br />0050 Sawcutting 200 LF $1.50 $300:OU <br />0060 Excavation . 125 CY $20.00 $2,500.00 <br />0070 Conc~ete dowelled Paving, 10 in 740 SF $20.00 $14,800.00 <br />0080 Concrete Walk (pedestrian island), 6" 900 SF $6.00 $5,4U0.00 <br />0090 Pedestrian Rail (architectural fencing) - 200 LF $100.00 $20,000.00 <br />0100 Concrete Gurbs 980 LF $20.00 $3,600.00 <br />0110 Level 2, 1/2" Dense HMAC 13 TON $120.00 $1,560.00 <br />0120 Aggregate Base _ 67 TON $20.00 $1,340.00 <br />0130 Pavement Line 336 SF ~$5.00 $1,680.00 <br />~ 0140 Thermoplastic, Non-Prof, 120 Mil, Extruded 1 LS $500.00 $500.00 <br />0150 Truncated Domes Texturing 110 SF $25.00 $2,750.00 <br />0160 Adjust Manholes 2 EA $850.00 $1,700.00 <br />0170 Landscaping 1 LS $10,000.00 $10,000.00~ <br /> Total Construction $86,112.00 <br />Testing (percent of construction) <br />Contingency (percent, of constructionj <br />Engineering (percent of construction, testing; contingency) <br />Total , <br />Estimated Total <br />2% $1,722.24 <br />, 25% $21,528.00 <br />20% $21,872.45 <br />$131,234.69 <br />$131,000 <br />