. :- <br />f ; <br />~- UO Arena Mitigation, Citv Priorities <br />Cost Estimate design scope and assumptions 08/O1/2008 , <br />2- Agate Street mid-block pedestrian crossing between 13~' and 15~'. <br />, <br />Scope: <br />Reconfigure the mid-block pedestrian crossing Agate between 13~h a~`id 15th. This would <br />include squaring,up'and offsetting-the crosswalks, creating a.raised pedestrian median, <br />constructing architectural fencing and landscaping to assist in channelizing pedestrians. <br />Assumptions: ~ <br />~ Reconstruct the entire pedestrian, crossing area. <br />Raised 14' wide concrete crosswalks. <br />Travel lanes reduced to 12-foot width with 10-foot HMAC approach ramps to`raised <br />crosswalks. • <br />Raised concrete pedestrian median/island with curb around landscaped areas. <br />New crosswalk and other striping. <br />Possible irrigation costs not included. <br />\ - <br />; <br />