New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
UO Arena Mitigation
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
2009
>
UO Arena Mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:59:59 AM
Creation date
9/30/2008 2:14:13 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Executive Director
PWA_Project_Area
Development
PW_Subject
UO Arena Mitigation
Document_Date
8/1/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. :- <br />f ; <br />~- UO Arena Mitigation, Citv Priorities <br />Cost Estimate design scope and assumptions 08/O1/2008 , <br />2- Agate Street mid-block pedestrian crossing between 13~' and 15~'. <br />, <br />Scope: <br />Reconfigure the mid-block pedestrian crossing Agate between 13~h a~`id 15th. This would <br />include squaring,up'and offsetting-the crosswalks, creating a.raised pedestrian median, <br />constructing architectural fencing and landscaping to assist in channelizing pedestrians. <br />Assumptions: ~ <br />~ Reconstruct the entire pedestrian, crossing area. <br />Raised 14' wide concrete crosswalks. <br />Travel lanes reduced to 12-foot width with 10-foot HMAC approach ramps to`raised <br />crosswalks. • <br />Raised concrete pedestrian median/island with curb around landscaped areas. <br />New crosswalk and other striping. <br />Possible irrigation costs not included. <br />\ - <br />; <br />
The URL can be used to link to this page
Your browser does not support the video tag.