, ,.~ ~ ~ . ~ ~ <br />, :~ <br />.; <br />~;" ~ ~ <br />, <br />UO Arena Miti~ation, City Priorities <br />, Cost Estimate design scope and assumptions 08/Ol/2008 ~ <br />6-South side of 15th curb extensions arid raised crosswalks at Walnut, Orchard and <br />Villard. <br />Scope: <br />Construction traffic calmirig curb extension (bulb out) and raised crosswalks with 10' <br />concrete ramp approaches on the south side of 15th at Walnut, Orchard and Villard. <br />Assumptions: <br />Bulb out curb extension with curb ramps and landscaping area. ~ <br />Portland Cement Concrete raised crosswall~s. <br />Replace and relocate existing curb inlets (three). <br />