UO Arena Mitigation, City Priorities <br />6- South side 15th curb extension and raised.crosswalks (three) <br /> 8/1 /2008 <br />' Construction Costs Quanti Unit Unit Price Extended Total <br />0010 Mobilization 1 LS 15% of const $18,030.00 <br />0020 Temporary Work Zone Traffic Control - Compiete 1 LS $3,000.00 $3,000.00 <br />0030 Erosion Control 1 LS $1,000.00 $1,OU0.00 <br />0040 Sawcutting 600 LF $1.50 $900.00 <br />0050 Excavation . 380 CY $25.00 $9,500.00 <br />0060 Concrete Walk, 4" 1200 SF $4.50 $5,400.00 <br />0070 Concrete Curb and Gutter 450 LF $25.00 $11,250.00 <br />0080 Concrete dowelled Paving, 10" 3800 SF $20.Q0 $76,000.00 <br />0090 Aggregate Base 120 TON $20.00 $2,400.00. <br />0100 Pavement Line 150 SF $5.00 $750.00 <br />0110 Truncated Domes Texturing 120 SF ' $25.00 $3,000.00 <br />0120 Landscaping 1 LS $7,000.00 $7,000.00 <br />0130 Curb inlet repiacement and relocation including pipe 3 EA $2,000.00 $6,000.00 <br /> Total Construction $144,230.00 <br />Testing (percent of construction) <br />Contingency (percent of construction) <br />Engineering (percent of construction, testing, contingency) <br />Total <br />Estimate Total <br />2% $2,884.60 <br />25% $36,057.50 <br />20% $36,634.42 <br />$219,806.52 <br />$220,000 <br />