New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 4376 Contract 2009-00006 w bid docs
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN 4376 Contract 2009-00006 w bid docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:46:06 PM
Creation date
9/8/2008 2:24:32 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004376
GL_Project_Number
965374
Identification_Number
2009050135
COE_Contract_Number
2009-00006
Retention_Destruction_Date
12/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
officers, agents and employees, the Lane County Board of Commissioners, the State of <br />Oregon, Oregon Transportation Commission and its members, and Department of <br />Transportation, its officers and employees. <br />00170.72 Indemnity; Hold Harmless <br />(Add) To the list of parties that the Contractor shall indemnify, defend and hold harmless to <br />include the State of Oregon, Oregon Transportation Commission and its members, and <br />Department of Transportation, its officers and employees. <br />00170.85 Responsibility for Defective Work <br />(Replace) Item (b) with the following: <br />(b) Contractor's Warranties <br />For those Items with Specifications referencing this 00170.85(b) warranty, the Contractor <br />warrants that the Work for those Items, including Changed Work, Additional Work, <br />Incidental Work, On-Site Work, and Extra Work, and Materials and Equipment <br />incorporated into the Work, shall meet the technical and performance Specifications <br />required under the Contract, from the date and for the period of time identified in each <br />applicable Specification or elsewhere in the Contract. The Contractor shall be <br />responsible for making good the Work, and for all repairs of damage to other <br />improvements, natural and artificial structures, systems, equipment, and vegetation <br />caused by, or resulting in whole or in part from, defects in warranted Materials, <br />Equipment, and workmanship. The Contractor shall be responsible for all costs <br />associated with site cleanup and remediation caused by, or resulting in whole or in part <br />from, defects in warranted Materials, Equipment, or workmanship. This warranty <br />provision shall survive expiration or termination of the Contract. <br />00170.85 Responsibility for Defective Work <br />(Add) Item (c) as follows: <br />(c) Manufacturer Warranties and Guarantees: <br />(1) Manufacturer Warranties -For those Specification Sections referencing this <br />00170.85(c-1) Subsection, the Contractor shall furnish Warranties from the <br />Manufacturer and signed by a Manufacturer's Representative. <br />The Warranty period will be specified in the applicable Specification Section for <br />which it applies. <br />The Warranty will start on the date the Engineer issues 3~d Notification and <br />authorizes final payment unless otherwise specified in the Contract. <br />When the Agency makes written notification to the Manufacturer of defects of <br />Work covered by this Warranty, the Warranty period will stop for the effected <br />Work with defects, as applicable, until the required repairs or replacements are <br />made and accepted. All repaired or replaced items shall meet current <br />Special Provisions -Job #4376 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.