2. Regional Wastewater SDC Excess Collected Based on Pending Study <br /> If a Regional Wastewater SDC paid pursuant to Exhibit B of this Methodology is <br /> greater than the charge resulting from a calculation based upon the adopted methodology <br /> resulting from a MWMC study, that difference will be refunded to the payee of the charge. <br /> Exhibit A to Administrative <br /> <br /> Order No. 58-97-02-F-1 -Page 2 <br /> <br />