b. . . <br /> s <br /> } <br /> Attachment #7 of Exhibit A <br /> Administrative Order No. 58-97-07-F <br /> Page 4 of 6 <br /> Table 5 <br /> WMC (Reg oval) Wastewater Systems Development Charge Analysis <br /> 1 Analysis of R gional Wastewater System Value <br /> A. Existing S stem Equity _ - _ <br /> y? Total Ass is $192,202,802 <br /> Total Liab lilies ($125,683,971) <br /> Lgcal Equity (n t assets) $66,518,831 <br /> B. Planned,., pacityEnhancements - - . _ <br /> Wet Wea er Peak Flow Improvements $3,907,500 <br /> MWVMC Syste Capacity and Allocation of Capital Values <br /> A.; existing System;Equrty ~ B . Ptarned Capacity Enhancements <br /> C mponent Design Percent of Component Design Percent of Component <br /> - Capacity Facility Cost Value Capacity Facility Cost Value <br /> A erage.Flow 49,000,000 22°~ $14,634,000 0 0% $0 <br /> P atC.l=(vw * 175,000,000 43% $28,603,000 16,000,000 100% $3,907,500 <br /> B D ` 66,000 19% $12,639,000 0 0°h $0 <br /> 71,600 16% $10,643,000 0 0% $0 <br /> Totals: 100% $66,519,000 100°k $3,907,500 <br /> Summary of Co potent Cost Calculation - - _ <br /> A. Average Dai Flow: <br /> Cost of Com onent }Design flow =Cost per gallon of average daily flow <br /> [ $14,634,00 49,000,000 gallons per day = $0.299 per gallon of average dairy flow ] <br /> B. beak Flow" ( (locates peak wet weather capacity to average user flow): <br /> Cost of Peak Flow Component _ Average Design flow =Cost of peak flow capacity per gallon of average <br /> daily flow <br /> ( $28,603,00 + $3,907,500) = 49,000 gallons per day = $0.664 per gallon of average dairy flow ] <br /> C. biochemical xygen Demand (BOO): <br /> Cost of BOD omponent + Design BOD daily capacity =Cost per pound of BOD per day <br /> $12,639,00 + 66,000 pounds per day = $191.50 per pound ] <br /> . suspended S lids (SS): <br /> host of SS C mponent + Design SS daily capacity =Cost per pound of SS per day <br /> ~ $10,643,000 + 71,600 pounds per day = $148.65 per pound ] <br /> " e unit cost of eak Flow is calculated on the basis of average daily plant capacity of 49,000,000 to <br /> e able recovery f costs from system users. <br /> <br /> Ju y 7, 1997 City of Eugene SDC Methodology Page D-9 <br /> <br />