. <br /> • <br /> 4 <br /> Attachment #7 of Exhibit A <br /> Administrative Order No. 58-97-07-F <br /> Page 3 of 6 <br /> FIGURE 5 <br /> MWMC Wastewater System <br /> Level of ervice Existing System Value Future System <br /> Present value Value <br /> <br /> mpact mea urement (minus) <br /> flow - gallo s per day Liabilities, grants, and Impact measurement <br /> 130D -poun s per day outstanding debt Future value of <br /> (equals) capacity-increasing projects <br /> SS -poun s per day from CIP <br /> Local equity <br /> Formulas: <br /> Unit Cost of Capacity <br /> (All component costs are added to determine the unit impact per FEU land use) <br /> The cost f existing plus future system values <br /> alto. ted to average and peak flow <br /> = Cost per gallon of daily flow <br /> Design flow <br /> The cost f existing plus future system values <br /> allocat to Biochemical Oxygen Demand <br /> = Cost per pound of daily BOD <br /> esign BOD capacity <br /> The cost f existing plus future system values <br /> a located to Suspended Solids <br /> = Cost per pound of daily SS <br /> Design SS capacity <br /> E: The cost pe unit of Flow, BOD, SS can be found in the current adopted SDC fee schedule in Appendix G. <br /> <br /> my 7, 1997 City of Eugene SDC Methodology Page D-8 . <br /> <br />