New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-97-21-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-97-21-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:14:42 PM
Creation date
8/15/2008 9:42:40 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Public Way Emergency Rule
Document_Date
2/25/1997
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
required to respond to locate requests after the project is completed but prior to availability <br /> <br /> ofi as-constructed drawings. <br /> <br /> The inspection for any utility facilities relocation which was performed due to the City's <br /> contract construction project but which lies outside the limits of the construction project <br /> shall be the responsibility of the Utility Inspector. <br /> 2.G.2 Privately Engineered Public improvement Projects <br /> Provisions for utility permits and inspection for City engineered and administered projects <br /> sha11 apply to privately engineered public improvement projects with the exception that <br /> Engineering Division personnel inspect only utility crossings installed concurrent with <br /> public improvements inspected by the Engineering inspector. All other right-of--way permit <br /> related inspection activities on such projects will be performed by the Utility Inspector. <br /> - r <br /> wl <br /> Utility & R/W Permit Policy 15 12/01/97 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.