'if <br /> • ~ <br /> i <br /> ~ I <br /> EXHIBIT A <br /> ~ STREET AND POLE BANNER FEE SCHEDULE <br /> Street r Pole Banner Permit (authorizes installation of one <br /> treet or pole banner for up to 21 consecutive days) $37.45* <br /> i <br /> Remov I of Street or Pole Banner by City, actual costs <br /> i curved by the City in connection with the removal <br /> f a banner, including equipment costs and City <br /> ~ ersonnel labor costs at the hourly rate in effect for <br /> t e involved employee(s) at the time the services are <br /> erformed, with a minimum charge of $75.00 <br /> *Inciud s a basic fee of $35.00 plus a 7% administrative charge. <br /> <br /> ~r <br /> i <br /> Exhibit R r:\adminord\fees\99bannerexa.wpd(05/11/99) <br /> I <br /> I <br /> <br />