New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-16-F-2
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-16-F-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 4:22:05 PM
Creation date
8/14/2008 12:05:46 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC Methodology
Document_Date
10/29/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
usage, th t the City Engineer may require that the City enter into an agreement with the <br /> owner to eview water usage at such time the development is in full production. <br /> Fin ing: It is the City's intent to ensure that SDCs are fully collected for an anticipated <br /> high Ovate usage. A sentence will be added to Table 4A and to Section 1.3, Appendix D of <br /> the metho ology. <br /> Co ment on revision to the local wastewater SDC: Clarify the definition of Plumbing <br /> Fixture U its (PFU). <br /> Find ng: The definition will be revised to indicate that the rate of charge per PFU will <br /> vary and i dependant upon a development's land use and associated impact to the public <br /> wastewat r system. In addition, the use of a unit equivalent to convert plumbing code fixtures <br /> to PFUs is also clarified. <br /> Com ent on revision to local wastewater SDC: Clarify the definition of Equivalent <br /> ~ Dwelling U it (EDU). <br /> ' <br /> Finding: The definition will be revised to indicated that an EDU is used in the <br /> transportat on SDC as a basis for determining the relative impact or service by different <br /> developme t types. <br /> Com ent on basis of charge: Provide further refinement of the description of Systems <br /> Developm nt Charge to reflect the intent of Oregon Revised Statues. <br /> ~ ~ Findi g: The description will be revised to state that SDCs are used to fund that portion <br /> ~ I, of the cost f constructing eligible infrastructure needed to respond to growth impacts in the <br /> community and where applicable to recoup a portion of the community's investment in the <br /> infrastructu a already in place. <br /> I ddition to the bove comments and findings, staff identified some typographical errors which <br /> a e been incorp rated in Exhibit A hereto. <br /> D. Base on the findings set forth above, I find that the revisions to the Systems <br /> elopment Cha ge Methodology and the fees as set forth in Exhibit A hereto are consistent with <br /> d pted policies a d ordinances of the City, in conformity with applicable state law, and should be <br /> i lemente~i effe ive September 15, 1999. <br /> On the basi of these findings, I order that: <br /> 1. The S stems Development Charge Methodology, attached as Exhibit A hereto and <br /> i c rporated herei , is hereby amended and the unamended portions thereof ratified and affirmed. <br /> 2. The S stems Development Charge Methodology as adopted herein shall become <br /> <br /> e dive Septemb r 15, 1999. <br /> tl- <br /> Dated this day of , 1999. <br /> ~ ~ Jim Johnson <br /> I, ~ City Manager <br /> ~ i <br /> l~dministrative Order No.58-99-16-F Page 2 0# 2 <br /> 'I <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.