.o <br /> a <br /> 4 For roperty improved or developed for housing for low-income persons, subject <br /> s P <br /> to the limitations andlor conditions imposed in Eugene Code, 1971 section <br /> 7.725(c). <br /> 2.3 Genera! Method for City of Eugene SDC Rates <br /> Table 1 provides an overview of the basis of the rate setting methodology; outlining the <br /> basic ates, cost basis, service standards and means of implementation far each system <br /> charg . <br /> The i tent of the methodology is that new development should not be charged for a <br /> highe level of service than that currently provided to the community or to which the <br /> com unity has committed future resources. Therefore, additional capacity needs are <br /> deter fined using the City's existing level of service or the City's funded level of service. <br /> In a s milar manner, new development should be credited for past and future bond <br /> paym nts on infrastructure related existing debt (Metropolitan Wastewater Management <br /> Com fission [MWMC]) and past trunk sewer levies. <br /> kj <br /> h <br /> 4 <br /> 1 <br /> `EO~ <br /> f <br /> <br /> ~1rr~ l City of Eu ene SDC Methodology Page 3 <br /> <br />