New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-29-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-29-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:39:07 PM
Creation date
8/13/2008 2:14:27 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Utility ROW Permit Fees
Document_Date
2/18/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
UTILITY RIGHT-OF-WAY USE PERMIT FEES ~ ' <br /> (Sections I, II, IV, V, and VI Effective January 1, 2003 <br /> Section III Effective February 2003) <br /> I. Annual ~~Blanket" Permits (3): <br /> Processing <br /> -Calendar yeaz 2003 $480.00 per permit <br /> Inspection <br /> -Calendar year 2003 $100.00 per each Provider activity <br /> II. Individual Permit Costs: <br /> Joint Trench(2) <br /> 1 Facili 2 Facilities 3 Facilities 4 Facilities <br /> Street Type (41(5) Local Arterial Local Arterial Local Arterial Local Arterial <br /> Projects less than 100 ft. <br /> -Calendaz year 2003..... $335 $395 $220 $260 $195 $231 $190 $225 <br /> Projects from 100 to 499 ft. <br /> -Calendar year 2003 $415 $440 $270 $330 $240 $290 $225 $275 <br /> Projects from 500 to 999 ft. <br /> -Calendaz year 2003..... $530 $640 $350 $420 $295 $365 $285 $335 <br /> Projects 1000 to 2000 ft.(1) <br /> -Calendaz yeaz 2003..... $680 $845 $450 $555 $385 $470 $355 $440 <br /> III. Maior Aerial Installation Permit Fee: <br /> If the activity to be permitted on an individual permit involves a primarily aerial installation only and <br /> exceeds 26,400 feet (5.0 miles), the permit fee shall be computed in two steps, as follows: <br /> Step One. The initia126,400 feet (5.0 miles) shall be permitted under the existing site specific permit <br /> fee contained in Section II. <br /> Step Two. All additional footage over 26,400 feet (5.0 miles) shall be computed at the rate of $ 0.10 <br /> cents per foot. This rate shall be applicable for the calendaz year 2003. Primarily aerial installations only <br /> that aze less than 26,400 feet and not specifically authorized under a blanket permit remain subject to the <br /> site specific permit fees of Section II of this schedule. <br /> For purposes of this section, "primarily aerial installation" is the installation of wire or cable type facilities <br /> on existing poles or approved above-ground structures. The installation or replacement of pole anchors may be <br /> approved as part of an aerial installation permit as long as the installation is completed within a radius of 10 feet <br /> from the existing pole or structure. Other ancillary equipment and underground facilities shall not be considered <br /> aerial components under this Schedule and as such shall require a separate site specific permit under Section II of <br /> this Schedule. In addition to these requirements, all aerial activities shall comply with the standazds contained <br /> Exhibit A - 1 <br /> <br /> C:\W INDOWS\TEMP\02 utilrowexa. wpd(02/O6/03) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.