New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-02-29-F
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-02-29-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 3:39:07 PM
Creation date
8/13/2008 2:14:27 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Utility ROW Permit Fees
Document_Date
2/18/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
within the Utility and Right-of--Way Permits Construction Within and Use of the Public Way Policies and <br /> Procedures Manual, and other applicable documents. <br /> J, Additional Fees: <br /> • Failure to maintain "approved plans" on work site at all times: $100 per occurrence. <br /> • Deviation from "approved plans" without prior authorization of the Utility Inspector: $500 per <br /> occurrence: <br /> • Failure to obtain a Utility Right-of--Way Use Permit prior to commencing a work activity requiring <br /> the said permit will result in a fee assessment equal to twice the original permit fee without the <br /> benefit of any joint trench fee reduction. <br /> V. Notes: <br /> 1. j Projects greater than 2000 ft. in length will be chazged the appropriate permit multiples equal to the length <br /> of activity. <br /> 2. ~ Costs designated aze for each facility within the joint trench. <br /> 3. ' II The option of applying for an annual blanket permit is only available to providers franchised or licensed by <br /> the City. Those providers have the option of obtaining individual right-of--way cut permits for each <br /> ~ excavation activity performed withintheright-of-way or obtaining an annual blanket permit which covers <br /> s many activities associated with maintenance and minor installations within the right-of--way. The <br /> regulations pertaining to the annual blanket permit program aze contained within Section 2-B of the Utility <br /> and Right-of--Way Permits Construction Within and Use of the Public Way Manual adopted by <br /> Administrative Rule R-7.302-A. <br /> 4. Individual Permit Costs for collector streets and alleys aze chazged the same as local streets. <br /> 5. j Individual Permit Costs for Public Utility Easements (PUE) abutting street right-of--way shall be charged <br /> at the same rate as if the placement had been in that right-of--way. PUEs not abutting street right-of--way <br /> shall be charged at the rate for local streets. <br /> <br /> VL Oither <br /> E~cception permit for cutting street less than five years old: $1,000. <br /> i <br /> 1 <br /> I I <br /> i <br /> Exhibit A - 2 <br /> C:\VI~INDO WS\TEMP\02utilrowexa.wpd(02/06/03) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.