New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Interoperability Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Interoperability Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:58:27 AM
Creation date
8/6/2008 9:50:21 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Safety
PW_Subject
Communications Interoperability Plan
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Springfield PD will pre-designate SPD 2 for EPD back up. <br /> • Examples for doing this: EPD loses all Eugene UHF frequencies <br /> due to a hardware failure in the dispatch center or at both repeater <br /> sites. <br /> • In the event that SPD 2 is not available, viable alternatives .may <br /> include: discussion about shared service on SPD 1, <br /> or potential access to a Springfield PW UHF frequency. <br /> 3. To initiate SPD back up processes, SPD dispatch will call the <br /> CLCC shift supervisor and ask to activate. <br /> <br /> 4. To initiate EPD back up processes, CLCC will. call the on duty SPD <br /> supervisor. <br /> 5. Internal notifications within each agency will be made as appropriate. <br /> <br /> 6. The Centers are working to install a back up fiber link. Once installation is <br /> complete, this process will need to be tested. <br /> 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.