|
High Priority Projects--Continued
<br /> 598 NM Construct an interchange on I-25 to provide access to Mesa $4,000,000
<br /> del Sol in Albu uer ue
<br /> 599 OR Short Haul Intermodal Pilot Pro'ect, Eu ene $2,500,000
<br /> 600 VA Rivermont.4ve. (L nchbur Brid ei ravements $1,700,000
<br /> 601 MA Construct new interchange on I-95 between existing Route IA $500,000
<br /> ramp to the north and Route I23 ramp to the south, Attleboro
<br /> 602 OH Construct Waverly, Ohio South Connectorfrom US 23 to SR $3,200 000
<br /> 104 to SR 220
<br /> 603 VA Craig County Trail -improvements to trail in Craig County $150,000
<br /> 604 CO US 160, State Hi hwa 3 to East o the Florida River $6,000,000
<br /> 605 AS Village road improvements for Ta'u, Ofu, and Olosega-Sill $1,400,000
<br /> counties in Manua district
<br /> 606 PR Construction of 41ane connector serving PR 9922, PR 9939 $7,950,000
<br /> and PR 183 '
<br /> 607 PA Design, engineering, ROW acquisition & construction of $200,000
<br /> streetscapping enhancements, paving, lighting, safety
<br /> improvements, parking, garage & roadway redesign in
<br /> Duryea Borough, Luzerne County
<br /> 608 OK SH-33, Widen SH-33 from the Cimarron River East to US-177 $8,000,000
<br /> P e Coun , OK
<br /> 609 TX Washington Boulevard Improvements in Beaumont, Tezas $2,600,000
<br /> 610 FL Widen Midway Road
<br /> from South 25th Street to U.S.1 in St. $2,000,000
<br /> Lucie County
<br /> 611 NY Enhance road and transportation facilities in the vicinity of $5,000000
<br /> W. 65th St and Broadway,-New York City
<br /> 612 LA Construct Kansas-Garrett Connector and I-20lnterchange $5,000,000
<br /> Im rovements '
<br />
<br /> . 613. PA Construct the SR 1058 Connector between PA 309 and the $1,600,000
<br /> Pennsylvania Turnpike Northeast Extension in Montgomery
<br /> County -
<br /> 614 OK Reconstruct the Interstate 44193rd street interchan a $3,000,000
<br /> 61 S NY oadway improvements to Woodbury Rd at intersection with $2,000,000
<br /> osset-Woodbury Rd
<br /> 616 RI Construct a handicapped accessible trail and platform at $200 000
<br /> Kettle Pond Visitor Center Administrative Facili
<br /> 617 NJ Construct Great Swam National Wildli a Re/tt a Road $250,000
<br /> 618 CA Grade Separation at 32nd Street between I-1S and Harbor $1,000,000
<br /> Drive, San Die o
<br /> 619 IN Widen Old Meridian Street from 2 to 4 lanes, City of Carmel, $1,000,000
<br /> Indiana
<br /> 620 WI Construct a bi cle/ edestrian ath, Ci o Porta a $2,200,000 ,
<br /> 621 VA .Widen Route 17 in Sta ord .84,000,000
<br /> 622. VA Widen Route 820 in Ber ton, Vir inia $],200,000 _
<br /> 623 IL Construction of 2 Nonh/South Blvds. and 2 East/West Blvds. $7,500,000
<br /> in the vicinity of
<br /> Northern Illinois University
<br /> 624 CA Begin construction of road
<br /> from US-395 west towards SR-14. $1,000,000
<br /> _
<br />
<br />
|