|
High Priority Projects--Continued
<br /> 301 , NJ Widening Routes 1 and 9, Production Way to East Lincoln $500,000
<br /> Avenue, Union Coun
<br /> 302 PA Design, construct and upgrade interchange of US IS and US $4,000,000
<br /> 30 in Adams Coun
<br /> 303 OH State Route 8 Im rovements in Northern Summit Coun $3,000, 000
<br /> 304 CQ US SO East, State Line to Pueblo $7,500, 000
<br /> 305 IN Wuiening road (along Gordon Road, Sixth. Street, and West $10,000,000
<br /> Shafer Drive) to 3-lane street with sidewalk and "
<br /> improvements to existing bridge -White County/Monticella,
<br /> Indiana
<br /> 306 OH Widening Pleasant Ya1leyBagleyRoad (Rte27), Parma and $1,000,000
<br /> Middleburg Hei hu
<br /> 307 MA Rehabilitation ofl-95 WhittierBridge-Amesburyand - $2,000,000
<br /> Newbu ort
<br /> 308 CA Streetscape improvements at East 14th St-Mission Blvd in $750, 000
<br /> Alameda County
<br /> 309 NY Construct W. 79th St Rotunda, New York Ci $2,000, 000
<br /> 310 - TX AcguireKellyParkwayCorridorRight-of-way through San $2,000,000
<br /> Antonio
<br /> 311 NC Construct new routefrom.USl7to US 421 in Brunswick and $1;000,000
<br /> New Hanover Counties
<br /> 312 PA Construct safety and capacity improvements to Route 309 and $250,000
<br /> Old Packhouse Road
<br /> 313.. OR Delta Ponds Bike/Pedestrian Path $2,880,000
<br /> 314 FL Hollywood US Route 1 Young Circle Safety Improvement $2,300,000
<br /> 315 MI Houghton County, Gravel and paving of remaining 3.2 miles $430,000
<br /> in S.S mile stretch of.7acobsville Rd
<br /> 316 PA Improve access to Airport Connector
<br /> from PA 283 to the $500,000
<br /> terminus of the Airport Connector at State Route 230 and
<br /> adjacent access roads '
<br /> 317 CA Construct one additional all purpose lane in each direction on ~ $1,210,000
<br /> 1405 and provide additional capital improvements from SR
<br /> 73 through the LA County line
<br /> 318 IL Im rove Roads and Brid es, Cook Coun $4, 000, 000
<br /> 319 CA Improve traffic safety, including streetlights, from Queen to $1,400,000
<br /> Barclay to Los Angeles River to Riverside in Elysian Palley,
<br /> Los An eles
<br /> 320 MI Construction and improvements to Western Avenue and ~ $2,300, 000
<br /> associated streets betweeen Third Street and Terrace Street in
<br /> Muske on
<br /> 321 b Construct Reed Station Parkway Extension to H Rt 3, $2,000, 000
<br /> Carbondale
<br /> 322 AL Constructiono PaeronlslandBrid eCorridor $10,000,000
<br /> 323 MI Highland, Clyde Road
<br /> from Hickory Ridge to Strathcona $125, 000
<br /> 324 MI Alger County, Repaving a portion of H-58 between Sullivan $1,600,900
<br /> Creek towards Little BeaverRoad
<br /> 325 TX Im rovements to US 183 in Gonzales Coun $500,000
<br /> 326 CA Construct a raised landscaped median on Alondra Blvd $400,000
<br /> between Clark.4ve and Woodru Ave in Bel~ower
<br />
<br /> 327 MN Ri htofw ac uisition orTH23Pa nesvilleBv ass $2,500,000
<br />
<br />
|