|
High Priority Projects--Continued
<br /> 2859 FL Construct Interstate-4/CrosstownConnector $1,000,000
<br /> 2860 UT Add lights to road
<br /> from Halchita to Mexican Ilat on Navajo $200, 000
<br /> Mountain
<br /> 2861 CA Construct off ramp at Interstate 8/Imperial Avenue $3, 000, 000
<br /> Interchan e, E! Centro -
<br /> 2862 VA Cranesnest Trail -construction of hiking, biking, horse trail $650, 000 _
<br /> om Route 83 to Cranesnest Cam ound
<br /> 2863 NC Durham and Chatham Counties, NC Completion ofAmerican $2,000,000
<br /> Tobacco Trail
<br /> 2864 TX Austin to Manor Rail Trail, Texas $2,OOQ000
<br /> 2865 PA Eliminate existfng rail line in Indian, PA to eliminate 37 a1 $4,000,000
<br /> grade crossings and reconstruct the line outside the town from
<br /> Glenn Lock to Middletown
<br /> 2866 MN Extend Cuyuna Range and Great River Road Trails, Aitkin $400, 000
<br /> 2867 NY Conduct planning, engineering, and eventual construction of $500,000
<br /> Rte. S in City of Oneida, from Seneca St. to county line
<br /> 2868 NY Great Neck Road Tra c Calmin Pro'ect $400, 000
<br /> 2869. NJ Design and construct newstreetscape through Irvington $1,000,000
<br /> Center
<br /> 2870 IL Construct connector road between Collinsville Rd to $6,ODQ000
<br /> IL3/North 1st St, St. Clair County
<br /> 2871 NJ Carteret NJFe Service Terminal $2,100,000
<br /> 2872 AL .Construct IIO-US231 Connector from Dothan, AL to Florida $2, 000, 000
<br /> 2873 OH Bi le Paths or the Ma is Mile in Willou b , OH $800, 000
<br /> 2874 NC Construct Interstate 73 74 in Montgomery County and $18, 000, 000
<br /> Richmond Coun ,North Carolina
<br /> 2875 NY Construct Phase III-90 Connector ITSLaboratory in - $b,000, 000
<br /> Rensselaer County
<br /> 2876 NC Desi nand construct Ai ort Area Roadwa Network $2,800, 000
<br /> 2877 WA Engineering and Construction of the Centennial Trail in $1,000,000
<br /> Snohomish
<br /> 2878 OR I-S Beltline lnterchan a $20, 000, 000
<br /> 2879 IL Extension North from Rt. 30 to Wheeler Road and Galena $4,760,000 -
<br /> Boulevard extension west of
<br /> Rt. 47 in Sugar Grove, IL
<br /> 2880 NY Newbu h, Im rove East End Roads $1,863,500
<br /> .2881 ME Constructiono the Kennebec River Rail Trail $400;000
<br /> 2882 CA Construct Bristol Street multi-modal corridor in Santa Ana $3,000,000.
<br /> .2883 CA Construct pedestrian sidewalk enhancements in Bel~ower $500, 000
<br /> 2884 KS Improvement and expansion for 2.7 miles ofK-18 in Geary $]4,500,000
<br /> Coun _
<br /> 2885 CA I-110/SR 47/Harbor Blvd. Interchangelmprovements, San $5,000,000
<br /> Pedro
<br /> 2886 MA Oxbow National Wildlife Refuge, Design and construction of $2, 000, 000
<br /> a Visitor Contact Stalion -
<br /> 2887 AL Pedestrian Im rovements for Pell Ci , AL $200, 000 '
<br />
<br /> .2888 WI Rehabilitate HighwaySlbetweenCTHSandUSHBin $2,000,000
<br /> Lincoln Count)
<br /> _
<br />
<br />
|