• Placing rock path base material <br /> • Remove duff and organic material where necessary <br /> • Place vegetation barrier fabric on rough subgrade <br /> • Drop and spread coarse rock base along path alignment <br /> • Placing rock path surface material <br /> • Drop and spread surface rock on base coarse <br /> • Compact surface rock and backfill along edges <br /> <br /> • Installing benches and interpretive signs <br /> • Excavate for footin s <br /> g <br /> • Construct concrete footings <br /> • Install benches and signs <br /> <br />