New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Coburg Connection (3)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Coburg Connection (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:08 AM
Creation date
8/6/2008 9:48:38 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Coburg Connection
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Message Page 2 of 2 <br /> they would face building their own plant. <br /> Commissioner Inge said that he is concerned about cost impacts from absorbing the extra flow and that we need <br /> to grapple with that and make sure there are no fiscal negative impacts. He stated that he does not see the <br /> discussions with Coburg to be a negotiation process. We just need to tell them what cost they will be charged to <br /> make us whole and they can say yes or no. There should be no negotiation. <br /> There was no vote taken. They have asked for the meeting notes of their discussion so they will have those <br /> available for their discussions with their governing bodies. I believe the schedule for Eugene and Lane County is <br /> <br /> to have a work session on this topic next Wednesday, so Susie was going to get the meeting notes out to them on <br /> Monday. <br /> 10/24/2005 <br /> _ _ _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.