New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Coburg Connection
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Coburg Connection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:06 AM
Creation date
8/6/2008 9:48:34 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Cost Refinement for Coburg - 2006
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1vlessage <br /> _ wo~~,~rces <br /> Page 1 of 3 <br /> COREY Kurt q <br /> From; SMITH <br /> Susan <br /> Sent: <br /> Tuesda <br /> <br /> " <br /> " Y, November 15, <br /> To: 2005 7:06 PM - <br /> RUFFIER peter J; COREY Kurt A <br /> Cc: <br /> Subject: BROWN Dan' KELLY Mike <br /> RE: Coburg's MW <br /> importance: MC Connection <br /> High <br /> Kurt and Peter, <br /> After Peter and I reviewed <br /> Dennis and Mike a `path fonyard" <br /> sent b and have the this evenin <br /> y one of the m decide whether to t g' ~t seems that we ma <br /> appropriate. m on behalf of both. rY to formulate the y want to fo <br /> Council ? think that ? understand that Dennis was thinki rward this information to <br /> meetin Mike will want to combined info into a <br /> g is on Monday ni ht make a more timely res ng that a letter would getter or an e <br /> Here's g ~ and he'll want to ponse (probabl most mail <br /> - a shot at the S get a response to him Y through email), because our <br /> from the pringfield side of the res prior to the <br /> Eugene side. ponse to D meeting. <br /> on Schuessler's inqui,-y. In blue below i <br /> The Springfield Ci <br /> extension of Council has indicated- its s Peter's info <br /> our Council until the ater services to Cobur , wilhn <br /> gness to proceed with ste <br /> been that the public decision- g Actual thum ps tha <br /> y ex ect makin bs up/thu t could ° <br /> a connection fee p Cobur 9 processes mbs down decisions ould not bead to <br /> that achievestfu lucosthrecovery, W have run their course. <br /> should take less u?1'costs of the up-front work that would iro made by <br /> would like to time and co _ , guidance to staff thus far has <br /> be as res me at a lower c"b' a recognize that Cobur ' ccur and that the <br /> time and cost less p°nsive and ex st, and that the ultimate connect <br /> on1ew,s that the y would pay <br /> critical co than our estimates peditioUs in pr°cessin costs should be oWe WOWe <br /> resourcesnCern to Cobur , ~ we would all be g this matter as possible, <br /> to be g and we feel we owe it to Well-served. and if the process takes less <br /> experience assigned to this Cobur , However, we understand that timin <br /> and a we have pjoject, tot g and our elected officials who <br /> ry to paint a realistic picture of w <br /> genc had with inter'urisdictional decision g is a <br /> y costs to compete the makin will authorize the <br /> Re precursor work g of this nature at lies ahead. Based on si <br /> garding your re and approval processes rna' we estimate that the gnificant <br /> additional coordination t to isolate the work needed to evaluat y even be time frames <br /> that were among Eugene and S °n the optimistic side. <br /> the Eu provided to the joint elected grin field. e Coburg's re <br /> gene Council re °fficials does limit theescotimeated timef <br /> acne this is an issue that <br /> potential ' quested that a broader and costs for " may require <br /> factored ,nto the tions' requests. decision p of work to up front <br /> current estimateshe resources model be develo a Coburg-onl work <br /> and time needed to develod that could be Y analysis. However, <br /> p such applied to other <br /> a decision model have not been <br /> From; <br /> RUFFIER peter ] <br /> Sent: [mailto Peter.]. <br /> Tuesday, November 15 RUFFIER <br /> Sub eMITH Susan• Kurtq 05 5:48 pM ci.eugene.or.us] <br /> COREY <br /> 1 RE: Coburg's MWMC Connection <br /> Importance: High for <br /> Here's VMC <br /> a shot at Eugene's side of the response to D <br /> ;your <br /> On October 26 the Eu on Schuessler's ' i of the <br /> of a model that could be us dl o a <br /> otulcil inquiry' Please edit ruthlessly: sh to <br /> extension of re ~ on a 5 to 3 vote, authorized Ci n to be <br /> ist the Council in decidin ty staff to ~ being <br /> set a definitive gional wastewater service fro work on develo <br /> deadline for this work to m the MW g the question of w pment <br /> effort that can be MC to the Ci Nether to endorse <br /> put into the be brought back to the °f Coburg. The Co <br /> no separate fundin ~'Ork by staff is bein m for consideration ~cjl did not 'li' <br /> question of g has been allocated to su g determined b ~ and the level of <br /> whether the Eugene Co pport the y COrnpeting priorities and the fa <br /> uncil will undertalcing• It is therefore <br /> 11/16/2005 make a decision on the issue hard to ct that <br /> prior to the answer the <br /> - United Front trip <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.