New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport New Site Facilities
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Airport New Site Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:56:32 AM
Creation date
8/6/2008 9:48:11 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Airport
PWA_Project_Area
Budget
PW_Subject
Airport Improvements 2005
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br /> <br /> .Wetland Education Center Phase I of West Eugene Wetlands and 4J School District Partnership Project. <br /> This is the City's participation in Phase I. The total project cost is estimated at <br /> $1 million. Funding is for site improvements in association with 4J School <br /> District building and exterior classroom features. This facility will provide <br /> Stormwater education opportunities to students and general public including <br /> new on-site building and design concepts. <br /> Plan/Policy Document: West Eugene Wetlands Plan; Comprehensive <br /> Stormwater Master Plan <br /> Total Project Cost: $200,000 <br /> Stormwater Rehabilitation/Improveme <br /> Ayres Pond Outfall Retrofit Install a stormwater quality structure upstream of the outfall to Ayres Pond to <br /> remove large debris from the inaccessible lower portions of the open channel. <br /> Retrofit the existing outfall structure with a larger concrete pad and energy <br /> dissipaters. Design in FY06. Construction in FY08 & FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $774,000. <br /> General Stormwater Rehabilitate, reconstruct and install stormwater system where needed due to <br /> Rehabilitation age, poor materials, localized flooding, and/or systems limitations. Where <br /> feasible, natural systems are used to address existing problems in conformance <br /> with CSWMP. <br /> Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br /> Stormwater Management Plan; Stormwater Basin Plans <br /> Total Project Cost: $1,500,000 <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability <br /> problems along the Amazon Creek and the Willamette River within the City of <br /> Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $500,000 <br /> Retrofit Empire Park Pond Construct a 2 ac-ft sediment forebay for stormwater discharges into the pond <br /> and enhance the natural resources of the existing pond area (approximately 2.1 <br /> acres) through sediment removal and revegetation. Design in FY07. <br /> Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $57,000 <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.