Stormwater <br /> <br /> .Wetland Education Center Phase I of West Eugene Wetlands and 4J School District Partnership Project. <br /> This is the City's participation in Phase I. The total project cost is estimated at <br /> $1 million. Funding is for site improvements in association with 4J School <br /> District building and exterior classroom features. This facility will provide <br /> Stormwater education opportunities to students and general public including <br /> new on-site building and design concepts. <br /> Plan/Policy Document: West Eugene Wetlands Plan; Comprehensive <br /> Stormwater Master Plan <br /> Total Project Cost: $200,000 <br /> Stormwater Rehabilitation/Improveme <br /> Ayres Pond Outfall Retrofit Install a stormwater quality structure upstream of the outfall to Ayres Pond to <br /> remove large debris from the inaccessible lower portions of the open channel. <br /> Retrofit the existing outfall structure with a larger concrete pad and energy <br /> dissipaters. Design in FY06. Construction in FY08 & FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $774,000. <br /> General Stormwater Rehabilitate, reconstruct and install stormwater system where needed due to <br /> Rehabilitation age, poor materials, localized flooding, and/or systems limitations. Where <br /> feasible, natural systems are used to address existing problems in conformance <br /> with CSWMP. <br /> Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br /> Stormwater Management Plan; Stormwater Basin Plans <br /> Total Project Cost: $1,500,000 <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability <br /> problems along the Amazon Creek and the Willamette River within the City of <br /> Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $500,000 <br /> Retrofit Empire Park Pond Construct a 2 ac-ft sediment forebay for stormwater discharges into the pond <br /> and enhance the natural resources of the existing pond area (approximately 2.1 <br /> acres) through sediment removal and revegetation. Design in FY07. <br /> Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $57,000 <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 6 <br /> <br />