New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport New Site Facilities
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Airport New Site Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:56:32 AM
Creation date
8/6/2008 9:48:11 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Airport
PWA_Project_Area
Budget
PW_Subject
Airport Improvements 2005
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Storilnwater <br /> <br /> Gilliam Rd System Culvert Replace the existing culvert with a pedestrian bridge to maintain trail access. <br /> Replacement Reconstruct the channel to match the size and shape of the downstream open <br /> waterway. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $32,000 <br /> <br /> Jackson Street Pipe Pipe system capacity improvements along Jackson St. from 28th Ave. to 27th <br /> Improvements Ave. Design in FY08. Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $78,000 <br /> Kinney Park Channel .Restore flow to the historical channel through a newly constructed culvert and <br /> Restoration & W.Q. Facility construct a 7 ac-ft neighborhood water quality facility in Kinney Park. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $620,000 <br /> Pine View Neighborhood Construct a 4 ac-ft neighborhood water quality facility upstream of the Pine <br /> Facility View development outfall. Design in FY06. Construction in FY07. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $309,000 <br /> Royal Node Stormwater Enhance existing open waterways to achieve multiple benefits including <br /> Infrastructure conveyance, water quality, and natural enhancements. Land acquisition and <br /> design in FY04. Construction in FY05 & FY06 or as new development is <br /> approved in the Royal node. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans, Royal Node Plan <br /> Total Project Cost: $1,350,000 <br /> Water Quality Facilities -High Construct underground structural water quality facilities in developed, high <br /> Source Areas pollutant source areas. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $800,000 <br /> City of Eugene 20042009 Capital Improvement Program <br /> 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.