Storilnwater <br /> <br /> Gilliam Rd System Culvert Replace the existing culvert with a pedestrian bridge to maintain trail access. <br /> Replacement Reconstruct the channel to match the size and shape of the downstream open <br /> waterway. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $32,000 <br /> <br /> Jackson Street Pipe Pipe system capacity improvements along Jackson St. from 28th Ave. to 27th <br /> Improvements Ave. Design in FY08. Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $78,000 <br /> Kinney Park Channel .Restore flow to the historical channel through a newly constructed culvert and <br /> Restoration & W.Q. Facility construct a 7 ac-ft neighborhood water quality facility in Kinney Park. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $620,000 <br /> Pine View Neighborhood Construct a 4 ac-ft neighborhood water quality facility upstream of the Pine <br /> Facility View development outfall. Design in FY06. Construction in FY07. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $309,000 <br /> Royal Node Stormwater Enhance existing open waterways to achieve multiple benefits including <br /> Infrastructure conveyance, water quality, and natural enhancements. Land acquisition and <br /> design in FY04. Construction in FY05 & FY06 or as new development is <br /> approved in the Royal node. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans, Royal Node Plan <br /> Total Project Cost: $1,350,000 <br /> Water Quality Facilities -High Construct underground structural water quality facilities in developed, high <br /> Source Areas pollutant source areas. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $800,000 <br /> City of Eugene 20042009 Capital Improvement Program <br /> 5 <br /> <br />