<br /> ......Stormwater <br /> Streambank Stabilization Implement streambank stabilization projects to help streams adjust to increased <br /> runoff volumes while limiting negative impacts associated with downcutting, <br /> sedimentation, and erosion. Where appropriate, use bioengineering techniques <br /> to stabilize streambanks. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $700,000 <br /> Willow Creek West Branch Replace culverts along West Branch of Willow Creek. <br /> Culvert/Channel <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $83,000 <br /> Stream Corridor Acquisition <br /> Stream Corridor Acquisition Acquire right of way and/or easements along waterways for waterway protection <br /> or restoration and/or to facilitate access for maintenance purposes. <br /> Plan/Policy .Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $2,631,000 <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 7 <br /> r <br /> <br />