.Stormwater <br /> <br /> "Royal/Danebo Waterway Re- An open channel which includes a low flow channel, adjacent wetlands, flood <br /> construction conveyance capacity and maintenance access will be constructed on the north <br /> side of Royal Avenue within Candlelight Park to replace'an existing channel on <br /> the south side of Royal. <br /> Plan/Policy Document: ,CSWMP, Stormwater Basin Plans <br /> 'Total Project Cost: $225,000 <br /> Services for New Development Capacity enhancements for new developments as needed. <br /> Plan/Policy Document: SDC Policy; CSWMP <br /> Total Project Cost: $600,000 <br /> Restoration <br /> Corps Metro Waterway The U.S. Army Corps of Engineers will undertake a feasibility study to identify <br /> Restoration Study/Projects metro area waterway problems and opportunities, and recommended projects. <br /> Feasibility phase is expected to last three years (FY04 through FY06). After the <br /> - - - feasibility study is completed, and specific waterway restoration projects .are <br /> identified, the City and the Corps will sign a Project Cooperation Agreeement to <br /> construct projects that have been mutually agreed upon. Potential Eugene <br /> projects include: 1) restoration of portions of Amazon Creek, from headwaters to <br /> Fern Ridge and 2) salmon habitat restoration along the main stem of the <br /> Willamette River and its direct tributaries. <br /> ,Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $1,800,000 <br /> Wetland Mitigation Bank Enhancement and restoration of wetlands in West Eugene on various sites. <br /> Capital Projects Mitigation work in advance of development will result in certified credits to be <br /> sold to developers. <br /> Plan/Policy Document: West Eugene Wetland Plan; MOA between City of <br /> Eugene, BLM, Corps, EPA, DEQ, & DSL. <br /> Total Project Cost: $900,000 <br /> New Capital Facilities <br /> Downtown Water Quality Construct underground water quality facilities for the downtown area tributary <br /> Facilities to the Polk St. outfall. Funds previously budgeted for preliminary design. Final <br /> design and construction. in FY04-FY07. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $400,000 <br /> City of Eugene 20042009 Capital Improvement Program <br /> 4 <br /> r <br /> <br />