New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Airport New Site Facilities
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Airport New Site Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:56:32 AM
Creation date
8/6/2008 9:48:11 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Airport
PWA_Project_Area
Budget
PW_Subject
Airport Improvements 2005
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Stormwater <br /> Description of Funded Projects <br /> Upgrades and Caaacity Enhancement <br /> Beaver St &Hunsaker Ln Stormwater system improvements related to County road improvements to <br /> Stormwater Improvements Beaver St. and Hunsaker Ln. between Division and River Rd. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $50,000 <br /> Game Farm Rd Stormwater Stormwater system improvements related to County road improvements to <br /> Improvements Game Farm Rd between Coburg Rd and the Eugene City Limits. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $50,000 <br /> Greenhill Rd. Stormwater Stormwater system improvements related to County road improvements to <br /> Improvements. Greenhill Rd. between the Southern Pacific Railroad right-of-way and Barger <br /> Ave. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $100,000 <br /> Greenhill Tributary Storm Funds previously budgeted for Phase I design to address flooding problem in <br /> Improvements -Phase II Greenhill tributary. Phase I construction in FY02. Phase II design for water <br /> quality and natural resources enhancements in FY07. Phase II construction in <br /> FY08 and FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $1,290,000 <br /> Roosevelt Channel -Culvert Replace the existing pipe with a bridge (20' wide x 55' long) and reconstruct the <br /> Replacement channel to match the size and shape of the downstream open waterway. <br /> Plan/Policy Document: Stormwater Basin Plans <br /> Total Project Cost: $192,000 <br /> Royal Ave., Terry to Greenhill .Stormwater system improvements related to County road improvements to <br /> Rd. Royal Ave. between Terry St. and Greenhill Rd. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $100,000 <br /> City of Eugene 2004-2009 Capital Improvement Program <br /> 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.