Stormwater <br /> Table of Unfunded Projects <br /> (Figures in $1000's) <br /> Upgrades and Capacity Enhancement <br /> Beaver St &Hunsaker Ln Stormwater Improvements 50 <br /> Game Farm Rd Stormwater Improvements 50 <br /> Greenhill Rd. Stormwater Improvements 100 <br /> Royal Ave., Terry to Greenhill Rd. 100 <br /> Royal/Danebo Waterway Re-construction 1 19 <br /> Restoration <br /> Corps Metro Waterway Restoration Study/Projects 2 600 <br /> Eugene Millrace Opening -Phase 1 6,000 <br /> New Capital Facilities <br /> North Laurelwood Water Quality Facility 135 <br /> South Laurelwood Water Quality Facility 50 <br /> Total $9,204 <br /> Description of Unfunded Projects <br /> <br /> Upgrades and Capacity Enhancement <br /> Beaver St &Hunsaker Ln Stormwater Improvements Stormwater system improvements related to County road improvements to Beaver St. <br /> and Hunsaker Ln. between Division and River Rd. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $50,000 <br /> Game farm Rd Stormwater Improvements Stormwater system improvements related to County road improvements to Came Farm <br /> Rd between Coburg Rd and the Eugene City Limits. <br /> Plan/Policy Document: CSWMP, Stonmwater Basin Plans; Lane County CIP <br /> Total Project Cost: $50,000 <br /> Greenhill Rd. Stormwater Improvements Stormwater system improvements related to County road improvements to Greenhill <br /> Rd. between the Southern Pacific Railroad right-of-way and Barger Ave. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $100,000 <br /> Royal Ave., Terry to Greenhill Rd. Stormwater system improvements related to County road improvements to Royal Ave. <br /> between Terry St. and Greenhill Rd. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> Total Project Cost: $100,000 <br /> RoyaUDanebo Waterway Re-construction An open channel which. includes a low flow channel, adjacent wetlands, flood <br /> conveyance capacity and maintenance access will be constructed on the north side of <br /> City of Eugene 20042009 Capital Improvement Program . <br /> 6 <br /> <br />