New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:02 AM
Creation date
8/6/2008 9:47:59 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Engineering
PWA_Project_Area
Road Repair
PW_Subject
CIP
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> Stormwater <br /> Description of Unfunded Projects <br /> Royal Avenue within Candlelight Park to replace an existing channel on the south side <br /> of Royal. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $119,000 <br /> Restoration <br /> Corps Metro Waterway Restoration Study/Projects The U.S. Army Corps of Engineers will undertake a feasibility study to identify metro <br /> area waterway problems and opportunities, and recommended projects. Feasibility <br /> phase is expected to last three years (FY04 through FY06). After the feasibility study is <br /> completed, and specific waterway restoration projects are identified, the City and the <br /> Corps will sign a Project Cooperation Agreeement to construct projects that have been <br /> mutually agreed upon. Potential Eugene projects include: 1) restoration of portions of <br /> Amazon Creek, from headwaters to Fem Ridge and 2) salmon habitat restoration along <br /> the main stem of the Willamette River and its direct tributaries. <br /> <br /> • Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $6,600,000 <br /> Eugene Millrace Opening -Phase 1 This project is to open the piped portion of the Eugene Millrace on the Federal <br /> Courthouse site. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $6,000,000 <br /> New Capital Facilities <br /> North Laurelwood Water Quality Facility Construct a 5 ac-ft neighborhood water quality facility at the south end of Laurelwood <br /> Golf Course, just north of 30th Ave. This CP requires about 1.25 acres of commercial <br /> lahd acquisition. Acquisition in FY04. Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $135,000 <br /> South Laurelwood Water Quality Facility Construct a 6 ac-ft neighborhood water quality facility at the northwest end of the <br /> Laurelwood Golf Course, just north of 28th Ave. This CP requires about 1.5 acres of <br /> commercial land acquisition. Acquisition in FY05. Design in FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $112;000 <br /> City of. Eugene 20042009 Capital Improvement Program <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.