Stormwater <br /> Water Quality Facilities'- High Source Areas Construct underground structural water quality facilities in developed, high pollutant <br /> source areas. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $900,000 <br /> Wetland Education Center Phase I of West Eugene Wetlands and 4) School District Partnership Project. This is the <br /> City's participation in Phase I. The total project cost is estimated at $1 million. Funding <br /> is for site improvements in association with 4) School District building and exterior <br /> classroom features. This facility will provide stormwater education opportunities to <br /> students and general public including new on-site building and design concepts. <br /> Plan/Policy Document: West Eugene Wetlands Plan; Comprehensive Stormwater <br /> Master Plan <br /> Total Project Cost: $200,000 <br /> Stormwater Rehabilitation/Improvements <br /> General Stormwater Rehabilitation Rehabilitate, reconstruct and install stormwater system where needed due to various <br /> problems, such as deterioration due to age, poor materials, localized flooding, and/or <br /> systems limitations. Where feasible, natural systems are used to address existing <br /> problems in conformance with CSWMP. <br /> Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br /> <br /> " Stormwater Management Plan; Stormwater Basin Plans <br /> Total Project Cost: $2,000,000 <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability problems along <br /> the Amazon Creek and the Willamette River within the City of Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $750,000 <br /> Stream Corridor Acquisition <br /> " Stream Corridor Acquisition Acquire right of way and/or easements along waterways for waterway protection or <br /> restoration and/or to facilitate access for maintenance purposes. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $2,631,000 <br /> " City of Eugene 20042009 Capital Improvement Program <br /> 5 <br /> <br />