<br /> Stormwater <br /> New Capital Facilities <br /> Downtown Water Quality Facilities Construct underground water quality facilities for the downtown area tributary to the . <br /> Polk St. outfall. Funds previously budgeted for preliminary design. Final design and <br /> construction in FY04FY07. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $400,000 <br /> Cilham Rd System Culvert Replacement Replace the existing culvert with a pedestrian bridge to maintain trail access. <br /> Reconstruct the channel to match'the size and shape of the downstream open <br /> waterway. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $32,000 <br /> Cilham Rd Water Quality Facility Construct a 10.5 acre-ft neighborhood water quality facility adjacent to the open <br /> waterway in the area of a proposed park. The facility would treat runoff from a 254 <br /> acre drainage area. Acquisition in FY04 & FY05. Design and construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $200,000 <br /> Jackson Street Pipe Improvements Pipe system capacity improvements along Jackson St. from 28th Ave. to 27th Ave. <br /> Design in FY08. Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $78,000 <br /> Kinney Park Channel Restoration & W.Q. Facility Restore flow to the historical channel through a newly constructed culvert and <br /> construct a 7 ac-ft neighborhood water quality facility in Kinney Park. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $620,000 <br /> Pine View Neighborhood Facility Construct a 4 ac-ft neighborhood water quality facility upstream of the Pine View <br /> development outfall. Design in FY06. Construction in FY07. <br /> Plan/Policy Document:. CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $309,000 <br /> Royal Node Stormwater InfrastruFture Enhance existing open waterways to achieve multiple benefits including conveyance, <br /> water quality, and natural enhancements. Land acquisition and design in FY04. <br /> Construction in FY05 & FY06 or as new development is approved in the Royal node. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans, Royal Node Plan <br /> TotalPcojectCost: $1,350,000 <br /> City of Eugene 20042009 Capital Improvement Program <br /> 4 <br /> <br />