New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:57:02 AM
Creation date
8/6/2008 9:47:59 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Engineering
PWA_Project_Area
Road Repair
PW_Subject
CIP
Document_Date
9/26/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br /> Upgrades and Capacity Enhancement <br /> Greenhill Tributary Storm Improvements -Phase II Funds previously budgeted for Phase I design to address flooding problem in Greenhill <br /> tributary. Phase I construction in FY02. Phase II design for water quality and natural <br /> resources enhancements in FY07. Phase II construction in FY08 and FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $1,290,000 <br /> Roosevelt Channel -Culvert Replacement Replace the existing pipe with a bridge (20' wide x 55' long) and reconstruct the <br /> channel to match the size and shape of the downstream open waterway. <br /> Plan/Policy Document: Stormwater Basin Plans <br /> Total Project Cost: $192,000 <br /> Services for New Development Capacity enhancements for new developments as needed. <br /> Plan/Policy Document: SDC Policy; CSWMP <br /> Total Project Cost: $600,000 <br /> <br /> Restoration <br /> Delta Ponds Habitat Enhancements Restoration project in partnership with ACOE to enhance habitat and Stormwater <br /> quality in Delta Ponds. Funds previously budgeted for preliminary engineering. <br /> Preliminary engineering continues in FY02. Final design and construction FY03 and <br /> FY04. <br /> Plan/Policy Document: CSWMP, Natural Resources Assessment for Delta Ponds; <br /> Stormwater Basin Plans <br /> Total Project Cost: $925,000 <br /> Wetland Mitigation Bank Capital Projects Enhancement and restoration of wetlands in West Eugene on various sites. Mitigation <br /> work in advance of development will result in certified credits to be sold to developers. <br /> Plan/Policy Document: West Eugene Wetland Plan; MOA between City of Eugene, <br /> • BLM, Corps, EPA, DEQ, & DSL. <br /> Total Project Cost: $900,000 <br /> Willow Creek West Branch Culvert/Channel Replace culverts along West Branch of Willow Creek. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $83,000 <br /> City of Eugene 20042009 Capital Improvement Program <br /> 3 <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.