New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1998
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:46:09 PM
Creation date
8/5/2008 12:01:47 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~I ' I.IL~7V'JI'~~ _ - <br /> I'M~~r7¦I7/. <br /> J y 31, 1998 <br /> C~NTACT: Bob Noble, Airport Maintenance Manager, 682-8352 <br /> h m Public Information Section, 682-5523 <br /> F R IMMEDIATE RELEASE <br /> I'~SESSION TO PROVIDE INFORMATION ON AIRPORT MASTER PLAN UPDATE <br /> The City of Eugene is conducting a public information workshop for. the Eugene Airport <br /> t r Plan U date on Thursda Au ust 13 from 5 to 7 .m. at the Ai ort Administration <br /> M o p Y~ g ~ p ~ <br /> $uilding, 28855 Lockheed Drive. <br /> I <br /> The Master Plan Update, scheduled to be completed in early 1999, is being developed to <br /> as ess future aviation trends and present a comprehensive overview of the airport's needs over a <br /> 2 year period. At the workshop, airport staff and consultants selected to help develop the plan <br /> wil 1 present projections of aviation demand, an analysis of projected demand compared to the <br /> ca acity of the airport's facilities, and a preliminary list of facility needs over the next 20 years. <br /> Iii A Master Plan Advisory Committee has been reviewing and helping to guide the Master <br /> Pi Update. A group of technical advisors is also assisting in the development of the Master <br /> 1?l~n Update in areas such as land use planning and transportation. <br /> Additional workshops and other public presentations will be held throughout the study. <br /> Questions or comments on the Master Plan Update should be directed to Bob Noble at the <br /> Eu~gen~ Airport, 682-8352. <br /> <br /> Public !Works • Administration • City of Eugene • 858 Pearl • Eugene, OR 97401-2727 • Phone: (541) 682-5262 • FAX {541) 682-6826 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.