New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1998
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:46:09 PM
Creation date
8/5/2008 12:01:47 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R E N D RI C KS PARK AREA <br /> C~RAINAGE IMPROVEMENTS <br /> <br /> Construction Begin Monday, September 28 <br /> <br /> Sc edule: Completed by October 9 <br /> Pu pose of Project: Generally improve stormwater drainage <br /> system in and around park area <br /> Soc~pe of Work: • Install curb on east side of Floral Hill Drive to <br /> channel stormwater away from forested area <br /> • Install underground storm drain in Summit <br /> Drive and Birch Lane near the picnic shelter <br /> • Install 6 catch basins at the intersections of <br /> I~ Summit Drive with Hubbard and Parkside to <br /> address erosion problems <br /> ~ • Install shallow lines to carry the picnic <br /> II shelter's roof drainage to the drainage system <br /> Tr~ffic Control: At least one lane kept open during daytime <br /> construction hours <br /> I <br /> Sp~cial Provisions: Arborist on site during excavation phase <br /> rn ractor: Western Ore on Excavation of Blue River <br /> Cb t g <br /> Project Manager: Teri Higgins, City of Eugene Public Works <br /> Engineering Division <br /> More Information: 682-5560 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.