R E N D RI C KS PARK AREA <br /> C~RAINAGE IMPROVEMENTS <br /> <br /> Construction Begin Monday, September 28 <br /> <br /> Sc edule: Completed by October 9 <br /> Pu pose of Project: Generally improve stormwater drainage <br /> system in and around park area <br /> Soc~pe of Work: • Install curb on east side of Floral Hill Drive to <br /> channel stormwater away from forested area <br /> • Install underground storm drain in Summit <br /> Drive and Birch Lane near the picnic shelter <br /> • Install 6 catch basins at the intersections of <br /> I~ Summit Drive with Hubbard and Parkside to <br /> address erosion problems <br /> ~ • Install shallow lines to carry the picnic <br /> II shelter's roof drainage to the drainage system <br /> Tr~ffic Control: At least one lane kept open during daytime <br /> construction hours <br /> I <br /> Sp~cial Provisions: Arborist on site during excavation phase <br /> rn ractor: Western Ore on Excavation of Blue River <br /> Cb t g <br /> Project Manager: Teri Higgins, City of Eugene Public Works <br /> Engineering Division <br /> More Information: 682-5560 <br /> <br />