Public Works <br /> MAY 24, 1996 Administration <br /> City of Eugene <br /> CONTACT: Don McLane, Oregon Department of Transportation, 686-7610 858 Pearl Street <br /> Paul Klope, City of Eugene Public Works Engineering, 687-5560 Eugene, OR 97401 <br /> (503) 687-5262 <br /> From Public Information Section, 687-5523 <br /> FOR IMMEDIATE RELEASE <br /> WEST EUGENE PARKWAY IS TOPIC OF OPEN HOUSE ON THURSDAY <br /> A community open house to discuss proposed design changes to the West Eugene Parkway <br /> will be held Thursday, May 30, from 7 to 9 p.m. at the Willamette High School cafeteria, 1801 Echo <br /> Hollow Road. <br /> The open house will focus on design modifications for the east and west ends of the <br /> parkway, which is planned to eventually connect Highway 126 (Florence-Eugene Highway) to <br /> <br /> ~r' Highway 99. Construction of the first phase of the project, from Beltline Road to Garfield Street, is <br /> scheduled to begin this year. <br /> The design modifications involve future phases of the project. On the west end, from <br /> Beltline Road to Highway 126 near the Oak Hill area, the alignment of the highway design has been <br /> shifted slightly to the north to lessen impacts to wetland areas. On the east end, a new overpass is <br /> being proposed to improve the connection of the parkway with Highway 99 near Fifth Avenue. <br /> Comments received from the public at Thursday's meeting will be addressed in a <br /> supplemental environmental impact statement required to modify the original design analysis <br /> prepared in 1990. <br /> Willamette High School is accessible to people with disabilities. Interpreters for people with <br /> hearing impairments can be provided by calling TDD 1-800-293-1438 at least 48 hours in advance <br /> of the meeting. <br /> <br />