New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:43:55 PM
Creation date
8/5/2008 9:30:40 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1993
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~I~-'/L~~~~~~~L <br /> J~~ <br /> Public Works <br /> Administration <br /> N E W S R E L E A S E City of Eugene <br /> 858 Pearl Street <br /> SEPTEMBER 9, 1993 Eugene, OR 97401 <br /> (503) 687-5262 <br /> CONTACT: Tom Larsen, Project Manager, 341-5886 <br /> From Public Information Section, 687-5523 <br /> FOR IMMEDIATE RELEASE <br /> WEST 11TH WIDENING PROJECT ENTERS NEXT PHASE <br /> Nighttime excavation work on the north side of West 11th Avenue from <br /> Garfield to Tyinn has been completed, and the widening and improvement <br /> project will move into the next phase of paving and sidewalk installation. <br /> For the safety of motorists, temporary striping will be repainted early <br /> Monday morning between the westbound lanes on West 11th. The existing <br /> striping was worn off by construction activities during the excavation phase <br /> of the project. <br /> New curbing has been installed on the north side of the widened street, <br /> and crews will begin building the new lane in the next week or so. Most of <br /> the work during this phase of the project will be done during the daytime. <br /> Once the new lane has been constructed, the old surface on the existing <br /> four-lane street will be removed and new paving will be applied to all five <br /> lanes of the new street. The paving work most likely will be done at night. <br /> During construction, motorists are advised to use alternate routes to <br /> avoid dela~s on West 11th. The improved, five-lane street should be fully <br /> open to tr~ffic in about two months. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.