New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
River Road 1991-1993
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
River Road 1991-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:33:19 PM
Creation date
8/4/2008 2:01:53 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-r- <br />>~~~~;~ <br />~~~~ <br />April 10, <br />~ CONTACT: <br /> <br /> <br />~~ 1 <br />Public Works <br />Engineering <br />River Road/Santa Clara <br />Sewer Project <br />M E D I A A D V I S O R Y <br />1991 <br />City of Eugene <br />860 West Park, Room 240 <br />Eugene, Oregon 97401 <br />(503) 683-6862 <br />Eric Jones, River Road/Santa Clara Public Information, 683-8823 <br />UPDATE ON 1991 RIVER ROAD SEWER PROJECT <br /> <br />The esign phase of the 1991 River Road sewer construction project is <br />complete, and the City of Eugene currently is accepting bids for work in <br />three co struction "basins." The total cost estimate for the 1991 sewer <br />construe ion, including finance and engineering charges, is $6.7 million. <br />Here's a ditional information about each of the three 1991 basins (see map on <br />the back of the attached letter for location information): <br />BAS N D - Bid opening scheduled for Wednesday, April 24, 2:30 p.m., at <br />Eugene C ty Council Chamber, 777 Pearl St. This is the largest of the three <br />basins a d the last of the bid openings. Engineer's estimate of Basin D <br />construction costs is $1.8 million. <br />BAS N E - Bid opening scheduled for Tuesday, April 23, 11 a.m., Eugene <br />City Cou cil Chamber. Engineer's estimate of Basin E construction costs is <br />$1.4 mil ion. <br />BAS N F - Bid opening scheduled for Friday, April 19, 11 a.m., Eugene <br />City Cou cil Chamber. Engineer's estimate of Basin F construction costs is <br />$1.3 mil ion. In this same general area, Wiidish Construction, under con- <br />tract to~ Lane County, is widening and improving Maxwell Road and installing <br />(over) <br />
The URL can be used to link to this page
Your browser does not support the video tag.