Public Works <br /> City of Eugene <br /> N E W S R E L E A S E s58 Pear? Street <br /> Eugene, Oregon 97401 <br /> ~~eptember 2 1991 (503) 687-5262 <br /> ~~iCONTACT: P t Bayes,-~~roject Manager, 687-5228 <br /> jFrom Sandra Gleason, Public Information, 687-5523 <br /> FOR IMMEDIA E RELEASE <br /> REC NSTRUCTION ON SOUTH SIDE OF 13TH AVENUE TO BEGIN <br /> Wildis Paving Company, contractor for the 13th Avenue reconstruction <br /> F~roject, wi 1 switch to the south side of 13th Avenue on Wednesday, September <br /> 25. The so th lane will be completely closed in a five-block section between <br /> I'Vlashington nd Willamette streets. One lane of traffic will be open on the <br /> ~ newly const ucted north side. <br /> North nd south bound traffic on the side streets may be detoured as a <br /> <br /> iii,,,, result of t e construction. The south side of the intersections at <br /> Vlashington, Lawrence, Lincoln, and Olive streets will be closed. However, <br /> ~:outh bound traffic will be able to turn left onto the new completed north <br /> ~;ide. One ane will remain open at the Charnelton intersection; two lanes <br /> riill be ope for both north and south bound traffic at the Willamette Street <br /> <<nd 13th Av nue intersection. <br /> Both n rth and south lanes along the five blocks of the entire project <br /> viill be com letely closed on October 23 and 24 for final paving. The project <br /> is schedule for completion by October 28. <br /> i <br /> II <br /> <br />