.-_.~s <br /> i <br /> <br /> ' City of Eu ene 2 February 21, 1992 <br /> traffic. <br /> The C'ty Council asked the Downtown Commission to review the schematic <br /> design fro the 1991 Downtown Design Project and recommend a final design <br /> option in ime for the election. The survey work enables the City to do the <br /> preiiminar engineering necessary to prepare cost estimates for the project. <br /> Adjacent p operty owners are being notified. <br /> City raffic engineers have elected to take this opportunity to re-exa- <br /> mine wheth r Olive Street should be changed from one-way to two-way traffic <br /> from 8th t 5th Avenues. <br /> For i formation about the survey, contact Doug Weber, Public Works, <br /> 687-5291; or information about the project, contact Allen Lowe, Planning and <br /> Developmen 687-5481. <br /> j <br /> t <br /> i <br /> <br />