- <br /> Righ -of-Way & Easement Vacation Reciuest _ <br /> Will ams' Bakery <br /> Page 3 <br /> Tutu e Building Uses: (continued) <br /> With this proposed expansion plan the closing and vacation <br /> j of Moss Street became evident. Preliminary investigation <br /> of this possibility with the City of L•'ugene Traffic Depart- <br /> , ment and the University of Oregon indicated that the <br /> closing of Moss Street was feasible. <br /> Pro osed Moss Street Closure: <br /> j <br /> i• ~ The closure and vacation of Moss Strut for about 400 feet <br /> ..south of 13th would require creating a turnaround area at <br /> ~ `'the north end of Moss Street. <br /> An 8 inch cast iron water main, located in Moss Street <br /> running north and south would gave to be relocated to clear <br /> the proposed building addition. <br /> Upon approval of this application for Moss Street Closure, <br /> .Williams' Bakery would install the turnaround and pay for <br /> the relocation of the water main. <br /> i Williams' Bakery presently is served with gas and <br /> j electricity on the east side of the existing building, <br /> With approval of the Moss Street closure, these services <br /> would be relocated as agreed upon by the serving agencies. <br /> St mma ry <br /> Williams' Bakery respectfully requests your approval of the <br /> I closure and vacation of Moss Street. This closure will <br /> allow :dilliams' Bakery to continue its operation and make <br /> moclifications and additions required to upgrade its effi- <br /> eiency and productivity which is necessary to maintain <br /> their position in the marketplace. <br /> 1 <br /> Wi liams' a dry Re lest <br /> i <br /> ` <br /> f ~ i <br /> <br /> II <br /> ~mE:s V. Bernhard <br /> r <br /> chitect for Williams' Bakery <br /> • <br /> <br />