New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
1989
COE
>
PW
>
Admin
>
Public Affairs
>
Historical
>
1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 1:42:03 PM
Creation date
8/4/2008 9:58:26 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
External_View
No
PWA_Release_Date
1/1/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
News Rele se Ferry Street Bridge <br /> April 27, 1989 <br /> Page 3 <br /> Rein and said that over the next two years, the consultants will study <br /> the propo ed alternatives and possible solutions and analyze environmental <br /> considers ions. No decision on a preferred alternative will be made until <br /> j the EIS h s been completed and all public responses received. <br /> i <br /> The tudy area is generally bounded on the north by I-105, to the east <br /> by I-5, t the south by Franklin Boulevard, and to the immediate west of the <br /> i <br /> existing erry Street Bridge corridor. <br /> For ore information about the scoping document or the EIS, call <br /> i <br /> 687-5218. <br /> <br /> ~r? <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.