New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4510 Asphalt Maint Assoc Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4510 Asphalt Maint Assoc Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:35:03 AM
Creation date
7/24/2008 3:39:17 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004510
GL_Project_Number
985354
Identification_Number
2008100485
COE_Contract_Number
2008-00030
Retention_Destruction_Date
9/29/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
No Saturday work will be allowed except as required and specified on the <br /> construction drawings or as directed by the Engineer. <br /> Sunday or holiday work is not allowed. <br /> 00180.85 Failure to Complete in Time; Liquidated Damages <br /> (b) Liquidated Damages <br /> (ADD) ~ The liquidated damages for failure to complete the Work on time are $300.00 per <br /> Work Day. <br /> 00195.20 Changes to Plans or Character of Work <br /> (ADD) Significantly is defined as: <br /> a) An increase or decrease of more than 25 percent of the total cost of the work <br /> calculated from the original proposal quantities and the unit contract prices; <br /> or, <br /> b) An increase or. decrease pf more than 25 percent in the quantity of any one <br /> major contract item. <br /> For condition b) above, a major item is defined as any item. that amounts to 10 <br /> percent or more of the total contract price. <br /> 00225.02 GeneraF Requirements <br /> (ADD) Request modifications to the operation of traffic signals in writing to the Engineer <br /> 5 (five) business days in advance. <br /> - 00225.05 Contractor's Traffic Control Plan <br /> <br /> ~ <br /> <br /> ' (DELETE) The first sentence. <br /> (ADD) The Traffic Control Plan in the plan set has been approved for use by the <br /> Contractor. It is the Contractor's responsibility to provide TCM necessary to <br /> complete the Work operations while providing safe traffic control for the public. <br /> project workers. The Contractor may request modifications to the TCP or <br /> propose completely alternative TCP by submitting a detailed work schedule <br /> showing stage construction along with the proposed TCP in writing five (5) Work <br /> Days before the pre-construction conference for~review by the Engineer. If, as <br /> determined by the Engineer, the proposed TCP does not mee# the needs of the <br /> project, the proposed TCP will be rejected and no adjustment of Contract Time <br /> will be allowed. <br /> 00225.43 Temporary Traffic Delineation - <br /> (g} Striping - <br /> (ADD) Temporary striping is not required on bike lanes or to delineate parking spaces. <br /> Special Provisions -Job #4510 Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.