03/05/2004 FRI 17:03 FA% 541 882 6030 CITY EUGENE Pw ENG -~-~-~ VYILDISH CONSTRUCTION (~j021/028 <br />' CYTY OF EUGENE KEVISED 3/05/04 <br />' PROPOSAL <br />MARCH 11, 2004, 2:00 P.M. <br />TO THE CITY MANAGER <br />EUCENE,OREGON <br />JOB #3502 BID NUMBER 2 <br />BIDDER: WILDISH CONSTRUCTION CO. <br />The undersigned Bidder declares: <br />That Bidder has carefully examined and incorporates in this Proposal, by this referectce all documents utcluded <br />is the Dook of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br />Standard Specifications, Supplemental and Special Specifications, and City of Eubette Amendment #7, ~8, and l~9 <br />Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br />PA'VTNCr~ CURBS, [:TTTTF.RC~ STT)F.WAT.KS~ MF,T)TAN~ fiTRF.F.T T.Tf~HTC~'rRA~ <br />Si(YN~T,, 4TRF.F.T TRFF4~_WACTF:WATFR,~AN17 RT[lRM WATF'R nRA1NA(`Fi' (1N <br />f:ARnFN WAV FRnM SIST>FRS V1F:W AVF Tn MARTINI 11TWFR 1:INC IT2 B~'~p,., <br />CiTV l~;NrilyFF"R iNT'I~iATF,T).P..R.OJF,C'.T._.___.__ _ <br />That Didder has made an examination of the site of the proposed work and has made such investigations as arc <br />necessary to determine the character of the material and the conditions to be encountered, independently of the indication <br />on the plans; and that if the proposal is accepted, Bidder will contract with the Ciry of Eugene as provided in the Contract <br />Forrn. will to the extent of this bid, provide the necessary machinery, tools, apparaaTS, and o@Aer means of coflshuction, <br />and will fiunish all rnattrial and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and in accordance with the requirements of the Engineer. <br />The undersigned also agees that Bidder will order all material and equipment included under rllis contract and <br />will eomtnence work within ten (10) days after receipt ofNoticc to Procccd and that Bidder will complete the work in <br />all respeeu after commencement and will Dave the project completed BY SEPTEMBER 4, 2004 E?CCEI'T a-S <br />SPECIFIED IN THE SPECIAL SPECIFICATIONS and that Didder will pay as liquidated damages to the Gity for <br />any delay, the sum of STX HUNDRED DOLLAILS ($600.001 per day for each day required beyond that period. <br />PROp(lc,-i. _ _rllR fl1iA2 PACT t ~Tf 3 <br />DC/`CTU[t\ TTAA[ AAAD C e.C[nAA noT-ir rrur u.n r r n. nu <br />