New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3502 Wildish Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3502 Wildish Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:55:32 PM
Creation date
7/9/2008 10:48:29 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003502
GL_Project_Number
985014
Identification_Number
2004100501
COE_Contract_Number
2004-00020
Retention_Destruction_Date
10/25/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• CITY OF EUGENE <br />~' PROPOSAL <br />'• MARCH 11, 2004, 2:00 P.M. JOB #3502 BID (JMBER 2 <br />TO THE CITY MANAGER BIDDER: <br />EUGENE, OREGON <br />The undersigned Bidder declares: <br />That Bidder has carefully examined and incorporates in this Proposal y this reference all documents included <br />in the Book of Contract Documents and Specifications for this job which ' cludes but is not limited to the Plans, City <br />Standard Specifications, Supplemental and Special Specifications, a City of Eugene Amendment #7, #8, and #9 <br />Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, Bond Form for <br />That Bidder has made an ex nation of the site of the proposed work and has made such investigations as are <br />necessary to determine the character fthe material and the conditions to be encountered, independently ofthe ind ication <br />on the plans; and that if the Prop al is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br />Fonm, will to the extent of thi id, provide the necessary machinery, tools, apparatus, and other means of construction, <br />and will furnish all mater' 1 and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and ' accordance with the requirements of the Engineer. <br />The u ersigned also agrees that Bidder will order all material and equipment included under this contract and <br />will comme ce work within ten (10) days after receipt of Notice to Proceed and that Bidder will complete the work in <br />all respe is after commencement and will have the project completed BY SEPTEMBER 4, 2004 and that Bidder <br />will y as liquidated damages to the City for any delay, the sum of SIX HUNDRED DOLLARS ($600.00) per day <br />fo each day required beyond that period. <br />` PROPOSAL -JOB #3502 P.4GF 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.