• CITY OF EUGENE <br />~' PROPOSAL <br />'• MARCH 11, 2004, 2:00 P.M. JOB #3502 BID (JMBER 2 <br />TO THE CITY MANAGER BIDDER: <br />EUGENE, OREGON <br />The undersigned Bidder declares: <br />That Bidder has carefully examined and incorporates in this Proposal y this reference all documents included <br />in the Book of Contract Documents and Specifications for this job which ' cludes but is not limited to the Plans, City <br />Standard Specifications, Supplemental and Special Specifications, a City of Eugene Amendment #7, #8, and #9 <br />Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, Bond Form for <br />That Bidder has made an ex nation of the site of the proposed work and has made such investigations as are <br />necessary to determine the character fthe material and the conditions to be encountered, independently ofthe ind ication <br />on the plans; and that if the Prop al is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br />Fonm, will to the extent of thi id, provide the necessary machinery, tools, apparatus, and other means of construction, <br />and will furnish all mater' 1 and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and ' accordance with the requirements of the Engineer. <br />The u ersigned also agrees that Bidder will order all material and equipment included under this contract and <br />will comme ce work within ten (10) days after receipt of Notice to Proceed and that Bidder will complete the work in <br />all respe is after commencement and will have the project completed BY SEPTEMBER 4, 2004 and that Bidder <br />will y as liquidated damages to the City for any delay, the sum of SIX HUNDRED DOLLARS ($600.00) per day <br />fo each day required beyond that period. <br />` PROPOSAL -JOB #3502 P.4GF 1 of 3 <br />