Lower Amazon Floodplain Analysis, Scope of Work Page S Of 5 <br /> Pacific Water Resources, Inc. <br /> • List of project objectives and data gaps (estimated at 2 pages) <br /> • E-mail message regazding the execution of the UNET model <br /> • E-mail message regazding the execution of the SWMM model <br /> • Minutes of one meeting with the City (estimated at 1-2 pages) <br /> • Draft project understanding, scope, schedule and budget for Task 2 <br /> • Final project understanding, scope, schedule and budget for Task 2 <br /> • Identification of available GIS covers and transmittal to PWR <br /> • One map each identifying hydrologic and hydraulic study limits (one 8 %2" <br /> x 11", the other 11" x 17") with actual preparation by the City <br /> • Summary table comparing USAGE and URS hydraulics calculations (one <br /> 8 '/2" x 11 <br /> • Profile plot comparing USAGE and URS hydraulics results (one 8 '/2" x <br /> 11 <br /> <br /> Task 2 - To Be Determined <br /> PACIFIC <br /> WATER RESOURCES INC. <br /> <br />