<br /> ' 12/31/2003 1:3T PM 1 of 1 <br /> Fee Estimate for Lower Amazon Floodplain Analysis <br /> PROJECT: Lower Amazon Floodplain Analysis PROD QC PROJ STAFF <br /> DATE: 18-Dec-2003 MGR ENG ENG CLER. TOTAL PROJECT <br /> JOB No: 302 $130.00 $145.00 $89.00 $50.00 HRS COST <br /> TASK 1 -Develop an Understanding of E~asting System Hydrology/Hydraulics <br /> 1 Attend one Meeting with USACE i4 8 0 1 23 $3,030.00 <br /> 2 Attend one Meeting with FEMA 8 4 0 1 13 $1,670.00 <br /> 3 Quantify the Existing Data 8 2 32 2 44 $4,278.00 <br /> 4 Determine Future Objectives 4 2 2 1 9 $1,038.00 <br /> 5 Execute the UNET Model 1 0 8 0 9 $842.00 <br /> 6 Execute the SWMM Model 1 0 8 0 9 $842.00 <br /> 7 Attend one Meeting with the City 10 6 1 1 18 $2,309.00 <br /> 8 Develop Task 2 Scope of Work 8 1 1 1 11 $1,324.00 <br /> 9 Prepare Draft Memo of Findings 8 1 1 1 11 $1,324.00 <br /> 10 Prepare Final Memo 2 1 1 1 5 $544.00 <br /> 11 Pre are Exhibits 1 0 8 1 10 $892.00 <br /> LABOR SUBTOTAL 65 25 62 10 162 $18,092.98 <br /> EXPENSES (No Subconsuftants Assumed} $390.76 <br /> TOTAL TASK 1 - Develo an Understandi of Existi S tem H dro /H draulics $18,483.74 <br /> PROJECT: Lower Amazon Fkxxipiain Analysis PROJ QC PROJ STAFF <br /> DATE: 18-Dec-2003 MGR ENG ENG CLER. TOTAL PROJECT <br /> JOB No: 0 130.00 145.00 89.00 50.00 HRS COST <br /> PROJECT SUMMARY <br /> 1 TASK 1 -Develop an Understanding of Existing Sysb 65 25 62 10 162 $18,092.98 <br /> 2 TASK 2- To Be Determined 0 0 0 0 0 $0.00 <br /> LABOR TOTAL 65 25 62 10 162 $18,092.98 <br /> TOTAL EXPENSES $390.76 <br /> GRAND TOTAL $18,483.74 <br /> Phase_1_Cost_ Estimate.pdf <br /> <br />