New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3867 Larry Wilson Contract 2004-05324
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3867 Larry Wilson Contract 2004-05324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 1:58:07 PM
Creation date
7/2/2008 3:58:14 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
003867
GL_Project_Number
905202
Identification_Number
2004100340
COE_Contract_Number
2004-05324
Retention_Destruction_Date
11/11/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRODUCT: Project map showing in detail the project location including trail and special <br /> structure locations that tie into the Work Summaries (printed map) <br /> 9) Construction observation shall be carried out on a regular basis during the construction <br /> phase, determined generally to be at least three (3) site visits per week or as necessary <br /> based on actual project circumstances. <br /> PRODUCT: Construction observation notes summarizing noted construction conditions, <br /> progress, deficiencies and modifications shall be submitted to the City of Eugene Public <br /> Works Engineering representative within 24 hrs. of each site visit. <br /> Notes: <br /> <br /> A. The proposed trail improvements (construction and reconstruction) are prioritized and <br /> listed below, referenced to the Skinner Butte Trail Development Plan. Phase 1 of the trail <br /> improvements shall include all or a portion of the following priority list under a maximum <br /> funding for the development of $42,000. The projects under phase 1 shall include the <br /> obliteration of the trails that are within the project limits that were recommended in the <br /> Skinner Butte Trail Development Plan. <br /> • Route 1 <br /> • Route 2 (pt 7 - pt 11, pt 10 - pt 33, pt 11 - pt 34) <br /> • Route 5 <br /> • Route 7 <br /> • Route 7 (pt 29 - pt 5) <br /> B. The target date for delivery of items 1 through 8 shall be June 15, 2004. <br /> <br /> C. Items 4 through 8 includes the engineering portion of the trail construction contract <br /> required to enable the contractor to bid and construct the project. The provisional portion <br /> of the contract required in public works contracts will be inserted into the contract by the <br /> City of Eugene. The area and vicinity maps will also be the City of Eugene responsibility <br /> to insert them as pages 1 and 2 of the engineering drawings. <br /> <br /> D. The construction contract will be quoted, awarded, and administered by a representative <br /> of the City of Eugene Public Works Engineering. <br /> <br /> E. Directives to the construction contractor, as well as construction change orders and <br /> modifications will be executed by the City of Eugene Public Works Engineering <br /> representative (see note D below). <br /> <br /> F. Construction observation notes and all other construction-related activity shall be <br /> submitted to, and coordinated with: <br /> Emily Proudfoot <br /> City of Eugene <br /> Public Works Engineering <br /> 858 Pearl Street <br /> Eugene, OR 97401 <br /> (541) 682-6019 <br /> emily.a.proudfoot@ci.eugene.or.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.