them for doing that. Mr HIedick made it clear to me that they did not want the pipe to remain <br /> <br /> ice, long term and suggested we lookat sending the water to the City system in County Farm Road <br /> that goes through their property to the River. <br /> Y <br /> !7 <br /> f <br /> Subdivision Construction Work <br /> 92-523 Sterling View 1st ADD - drywells built in `92 (includes Wester Street) <br /> k 2nd ADD -more drywells built in `93 further south of Wester (but <br /> draining to Wester). <br /> Status of Basin Planning <br /> WCC are in the modeling phases of the basin planning. We have asked them to look at <br /> alternatives to draining into the gravel pit areas for both Wester Street and the larger drainage <br /> basin that ends at the pond on the north end of Riverpoint subdivision <br /> i <br /> i <br /> i <br /> i <br /> i <br /> i <br /> i <br /> i <br /> 1 <br /> i <br /> f <br /> I <br /> i <br /> <br />