i <br /> Alternatives to the site vary. The approach will likely be dependant upon gathered information and <br /> evaluation of options to the site. <br /> Alternatives may include: <br /> • Open Water Way <br /> Infiltration System <br /> • Piped System <br /> • Multiple alternatives <br /> It may be necessary to enlist the help of consultants for items such as natural resource evaluations and <br /> assessments. <br /> We will likely see some issues raised by concerned groups of citizens and neighbors that could <br /> I influence our directions and approach. <br /> i <br /> I have not tried to include an estimate for construction since there are to many unknowns at this point. <br /> j The initial Capital Improvement Funds are based on a preliminary scope of work that creates a straight <br /> "channel" waterway directly West to the Willamette River. This amount is $225,000. An estimate done <br /> by Woodward and Clyde for a high quality Natural Resource approach is at $1.8 million. We will need <br /> to look at this when we have a better understanding of all the elements of the site. <br /> <br /> r° I <br /> f <br /> r <br /> F <br /> E <br /> a <br /> 1 <br /> i <br /> i <br /> I <br /> t <br /> I <br /> F <br /> I <br /> i <br /> 1 <br /> 1 <br /> <br />