City of Eugene WBGS Architecture 8~ Planning <br /> Amazon Park Restroom October 25, 2004 -Revised <br /> <br /> t~~ Proaosal for Architectural and Englneerlna Senrlces <br /> Task: Coordination with Owner, coordination with design consultants, and <br /> prepare monthly invoices. Manage meetings, deliverables, quality <br /> control, and assignments, and maintain communication. <br /> Meetings: 2 meeting(s) with WBGS design team, 2 meeting(s) with consultants. <br /> Deliverables: Invoices and schedules. <br /> _ Assignment: WBGS <br /> D.7 Printing Documents <br /> Task: It is assumed that WBGS will provide the Owner will originals intended <br /> for reproduction, and the owner will coordinate the printing. <br /> I <br /> D.8 Fee estimate, this phase: $13,004 <br /> i <br /> Phase E - Permit Application <br /> The purpose of this phase is to obtain the building permit from the local jurisdiction. <br /> I <br /> E.1 Submit Permit -This task has been deleted from the proposal. The owner will submit <br /> the pem?it application. <br /> E.2 Coordinate with Plan Review -This task has been deleted from the proposal. The <br /> owner will coordinate with the PIC. <br /> E.3 Project Administration <br /> Task: Coordination with Owner. 2 hours total. <br /> Meetings: None <br /> Deliverables: Memo, if appropriate <br /> Assignment: WBGS <br /> E.4 Fee estimate, this phase: $126 <br /> Phase F -Bidding <br /> j The purpose of this phase is to assist the Owner with the bidding process. <br /> ~ F.1 Distribution of Bid Documents <br /> ~ Task: It is assumed the owner will distribute the bid documents. <br /> i <br /> F.2 Bid Period Activities <br /> Task: Coordinate the preparation of addenda items related to the building, <br /> ~ respond to bidders questions, attend bid opening conducted by the <br /> Owner, and review bid results. The owner will prepare the addenda and <br /> distribute. <br /> Meetings: Pre-bid meeting <br /> Deliverables: Response to addenda items. <br /> File: Amazon_Park RR-Scope_of Work Summary_2.doc Page 7 of 13 <br /> <br />