City of Eugene WBGS Architecture & Planning <br /> Amazon Park Restroom October 25, 2004 -Revised <br /> P sal for Architectural and Enalneerlna Services <br /> Meetings: Combined with the design task of this phase. <br /> Deliverables: Technical specifications (sections 3 through 16), and review of owner- <br /> prepared site related specifications. <br /> Assignment: WBGS -Architectural and Interiors <br /> 1. Division 3 to 14 <br /> 2. Review of earthwork section prepared by the Owner <br /> <br /> ' 3. Review of foundation drainage system prepared by the Owner. <br /> 4. Review of sidewalk section prepared by owner. <br /> Mechanical <br /> 1. Division 15 <br /> Electrical <br /> 1. Division 16 <br /> Structural <br /> 1. Review of specifications (prepared by Architect) as it pertains to the <br /> structural design. <br /> D.3 Code Compliance <br /> Task: Comply with applicable codes. Conduct code review including building <br /> code. Refine draft code analysis of building code requirements <br /> applicable to the project. <br /> It is assumed that City of Eugene landscape staff will research and <br /> provide direction regarding land use requirements. <br /> Meetings: Review progress of project relative to consultation meeting results with <br /> local jurisdiction through informal communication (such as "over the <br /> counter" meetings). <br /> Deliverables: Final code analysis for use by design team. Code compliance <br /> information provided on drawings. <br /> Assignment: WBGS <br /> D.4 Cost Estimate -This task has been deleted from the proposal. <br /> D.5 Owner Review Meetings <br /> Task: Prepare for the upcoming meetings, to coordinate project activities, to <br /> review and evaluate design activities, and to provide direction to the <br /> design team. <br /> Meetings: Meetings to occur at key intervals, including reviews of check sets. 3 <br /> meetings total. <br /> Deliverables: Meeting agendas, and meeting minutes. <br /> Assignment: WBGS, Owner review staff. <br /> D.6 Project Administration <br /> File: Amazon_Park_RR-Scope_of Work Summary_2.doc Page 6 of 13 <br /> <br />